Skip to content
KAS Reformas

Service

Plasterboard in Dénia, Jávea and surroundings

We build partitions, wall linings and suspended ceilings in plasterboard to reconfigure homes, hide services and insulate against noise and heat. Plumb metal framing, the right board for each room and taped joints so the wall is ready to paint without a mark showing.

We use it in full renovations and in stand-alone jobs alike: a new partition to split off a bedroom, a continuous ceiling with indirect lighting, or a lining with mineral wool against a noisy neighbour.

Plasterboard wall lining with mineral wool to soundproof a party wall during a full renovation in Dénia

What does this service include?

  • Partition walls

    48 or 70 mm framing with mineral wool inside and one or two boards per side depending on use. To create rooms, close off a kitchen or separate areas.

  • Wall linings

    Boards on a free-standing frame or fixed directly to the existing wall, to insulate, straighten a wall that is out of true or hide pipes and cabling.

  • Continuous suspended ceilings

    A flat ceiling on a hung frame, with a cove for indirect lighting if you want it, recessed downlights and room for air-conditioning ducts above.

  • Accessible ceilings

    In kitchens, plant rooms and commercial premises, demountable ceilings that keep access to air-conditioning units, valves and cabling.

  • Acoustic insulation

    Mineral wool of the right density, acoustic board and resilient strips around the perimeter to cut noise from neighbours and the street.

  • Thermal insulation

    Linings with wool or rigid panel on walls facing outside or under a roof, so the house does not turn into an oven in August.

  • Special boards

    Moisture-resistant (green) in bathrooms and kitchens, high-impact in hallways and areas that take knocks, fire-rated where a boiler room or garage calls for it.

  • Finishing and joint treatment

    Tape, several coats of compound and sanding. Corners with beading and junctions with the ceiling resolved so nothing shows through the paint.

Jobs we do regularly

  • Reconfiguring a flat

    Take down brick partitions and put up new ones in plasterboard: quicker, lighter and with the services running inside.

  • Soundproofing a wall

    Lining with mineral wool and acoustic board over the party wall with the neighbour or the wall facing the street.

  • Ceiling with integrated lighting

    Continuous suspended ceiling with a perimeter cove, LED strips and downlights, which also conceals ducted air conditioning.

  • Plasterboard in commercial premises

    Ceilings and linings over large areas, with access panels for services and a finish ready for airless spray painting.

How we build partitions, linings and ceilings

We start by setting out on the floor and ceiling with a laser: where each partition goes, what thickness it needs for the services running through it and where the doors sit. A partition with a WC frame or soil pipes inside does not use the same framing as one that simply separates two bedrooms.

We fix the tracks to the floor and ceiling with acoustic strip between the profile and the structure, and set the studs at the spacing the board requires, usually every 40 or 60 cm. That is where the electrical boxes, pipes and reinforcement for whatever will be hung later go in. We fill with mineral wool, close one side first, run any remaining services and then close the other.

For suspended ceilings we hang the frame from the slab with rods or direct hangers, depending on how far the ceiling drops, level it with a laser and screw on the board, leaving openings for spotlights and air grilles. If the ceiling has a cove for indirect lighting, the frame for the step is built at the same time.

The work is judged on the joints. Tape and three coats of compound, screws sunk and filled, corner beads, and sanding before priming. In the full renovation with soundproofing in Dénia, after the plasterboard we skim-coated the walls with a roller and smoothed them with a trowel so the finish was uniform throughout the house; in the 200 m² commercial premises in Dénia, with plasterboard ceilings and linings, the paint was sprayed with airless directly onto the treated board.

Materials and solutions we recommend

  • Standard 15 mm board on partitions and ceilings in dry areas, and double board per side where insulation or strength is needed.
  • Moisture-resistant board in bathrooms and kitchens, with additional waterproofing inside the shower.
  • High-impact board in narrow hallways, entrances and anywhere with children, pushchairs or bikes.
  • Mineral wool in every partition, not only the "insulating" ones: it improves the acoustics of the house and costs little more.
  • Resilient perimeter strips and a decoupled frame when the goal is to cut noise from a neighbour or a bar downstairs.
  • Free-standing lining (without touching the existing wall) rather than dot-and-dab board when the wall is damp, badly out of true or genuinely needs thermal insulation.

On a tight budget, we keep wool and double board where it matters (party walls and bedrooms) and use single board on internal partitions with no special requirements.

Common mistakes we avoid

  1. Studs without acoustic strip or clearance against the slab: the frame transmits vibration and the partition "rings".
  2. Leaving out reinforcement for kitchen units, televisions or wall-hung basins. Later on, fixings that will not hold or cracked boards.
  3. Standard board in bathrooms, which swells with the moisture behind the tiles.
  4. A suspended ceiling with no access panel by the air-conditioning unit: every service visit ends up breaking the ceiling.
  5. Rushing the joints: a single coat of compound without sanding shows up against the light as soon as it is painted, and on the coast there is a lot of raking light in the afternoon.

Indicative timescales

  • Partition to divide a room: 2 days with joints finished.
  • Soundproofing lining on a 4 or 5 metre wall: 2 or 3 days.
  • Living-room suspended ceiling with cove and lighting: 3 days.
  • Complete partitioning of a 90 m² flat: 1 to 2 weeks, interleaved with electrics and plumbing.
  • Commercial premises of 150 to 250 m², ceilings and linings: 2 or 3 weeks.

Plasterboard in homes in Dénia, Jávea and Gandía

The 1970s and 80s buildings on the seafront in Dénia and Gandía have 4 cm hollow-brick partitions with no insulation at all between flats. You hear the neighbour as if they were in your home. A lining with mineral wool on the party wall, like the one we built in the renovation with soundproofing in Dénia, completely changes how the flat feels to live in, and it is a job that can be done on its own, without a full renovation.

In penthouses and top floors, a suspended ceiling with insulation under the roof cuts the heat coming in during summer and is the natural place to run air-conditioning ducts without boxing on show. In villas in Jávea and Benissa with high ceilings, it also lets us lower hallways and bathrooms to integrate lighting and hide the pipework for an air-source heat pump.

In holiday homes, a lining over a wall with rising damp does not fix the problem, it only hides it. If the wall is damp, we treat it first or build a separate ventilated frame, and we tell you plainly at the site visit.

If you are away while the work is done, we send you photos of the frame with the wool and services in place before the second side is closed: it is the only chance to see where everything runs. Tell us what you want to separate, insulate or hide and we will look at it at the property.

How we work

  1. Visit

    We visit your home with no obligation, take measurements and listen to what you need.

  2. Itemised quote

    Line by line and in writing. A small job is priced quickly; a complex one may take a few days.

  3. The work

    Yuriy coordinates the trades and is on site. Any changes are priced before they are made.

  4. Handover

    We go over the work with you, clean up and hand it over ready to use.

Frequently asked questions about plasterboard

Will a plasterboard partition hold a kitchen unit or a wall-mounted TV?

Yes, if it is planned for. We fit timber or steel reinforcement inside the frame wherever wall units, televisions, wall-hung basins or a WC frame will go. Elsewhere on the wall, purpose-made plasterboard fixings are fine. That is why we ask what you plan to hang, and where, before we close the wall.

Do you hear more through a plasterboard partition than a brick one?

A well-built plasterboard partition, with mineral wool inside and a board on each side, insulates better than a plain hollow-brick partition. What makes the difference is the wool, the resilient strips around the perimeter and making sure there are no acoustic bridges. If the aim is to block out the neighbour, we build a dedicated lining with more mass and more wool.

How much height do I lose with a suspended ceiling?

The minimum is around 8 to 10 cm for frame and board. If ducted air conditioning runs above it, you have to allow for the unit and the ducts, which usually need 25 to 30 cm in the hallway or wherever the unit sits. In the other rooms the ceiling can drop less, with the difference taken up by a clean step.

Is plasterboard suitable for a bathroom?

Yes, with moisture-resistant board (the green one) and, in the shower area, a waterproofing primer under the tiles as well. That is how we build bathrooms in full renovations, and in commercial premises plasterboard goes in both ceilings and linings in wet areas.

How long does a partition or ceiling take to build?

A partition to split off a room goes up in a day and is finished the next. A suspended ceiling in a 25 m² living room with a cove and lighting takes about 2 or 3 days including the joint treatment. Repartitioning a whole flat in plasterboard usually takes a team one to two weeks, within the renovation schedule.

Can you paint straight onto plasterboard?

After the joints are treated and a sealing primer is applied, yes. On large surfaces we usually apply a skim coat with roller and trowel to even out the sheen between board and joint, and in commercial premises we spray with airless for a uniform, fast finish.

Plasterboard near you

We work in Dénia, Jávea and surroundings: Dénia, Jávea / Xàbia, Gandía, Ondara, Oliva, Pego, Benissa, Moraira, Calpe and the surrounding area.

Related services

Shall we talk about your renovation in Dénia, Jávea and surroundings?

Tell us what you need in terms of plasterboard. Free visit and quote, no obligation.